☀️ 83°Orlando, FLSunday, November 1, 2026
ORLANDO WATCHNEWSORLANDO
OUR CITY.
OUR LAKES.
ALWAYS ON.
BREAKING NEWS
Orlando Watch News — Orlando's own newsroom, covering the city and the coast
Live weather for Orlando and Orange County
Send news tips to contact@orlando.twanews.com
›
TRAFFIC

Sand Lake Road Narrows at Night Through Thursday: Milling and Resurfacing Between Orange Blossom Trail and Orange Avenue

FDOT lists intermittent single- and double-lane closures with flagging on S.R. 482 from 9 p.m. to 7 a.m., Sunday through Thursday nights, for milling, resurfacing and marking work on one of the tourism corridor's main east-west streets.

Orlando Watch News Orlando • Just now • TRAFFIC
Sand Lake Road Narrows at Night Through Thursday: Milling and Resurfacing Between Orange Blossom Trail and Orange Avenue (Orlando Watch News)

Drivers crossing the tourism corridor after dark this week will meet the milling machines on Sand Lake Road itself. The Florida Department of Transportation's District 5 listings put intermittent nighttime single- and double-lane closures, with flagging operations, on Sand Lake Road (State Road 482) from Orange Blossom Trail to South Orange Avenue, running Sunday, November 1 through Thursday, November 5, from 9 p.m. to 7 a.m. each night. The work is milling, resurfacing and marking — the full cycle of tearing up the old surface, laying new asphalt and painting it.

This is the surface street, not the interchange. Orlando Watch News has separately covered the overnight ramp closures at the I-4 and Sand Lake Road interchange (Exit 74A) running November 2-4; the S.R. 482 project is the arterial beneath and beyond it, the stretch that carries traffic between the Trail, the Florida Mall area and South Orange Avenue. A driver can meet both in one trip — a ramp closure on the interstate and a flagged single lane on the street below — and should budget for the combination on the nights they overlap.

FDOT's standing advice for the project is the department's usual caution: drive, walk and ride with caution and courtesy through the work zone. Flagging operations mean traffic alternates through the open lane in both directions at times, so even a short hop across the corridor can take longer than the map suggests between 9 p.m. and 7 a.m. The closures are scheduled to end with Thursday night's shift, at 7 a.m. on Friday, November 6.

See an error in this story? Read our Corrections Policy or contact the newsroom.
MORE TRAFFIC →

More in Traffic