☀️ 83°Orlando, FLSunday, November 1, 2026
ORLANDO WATCHNEWSORLANDO
OUR CITY.
OUR LAKES.
ALWAYS ON.
BREAKING NEWS
Orlando Watch News — Orlando's own newsroom, covering the city and the coast
Live weather for Orlando and Orange County
Send news tips to contact@orlando.twanews.com
›
TRAFFIC

Orange Blossom Trail Narrows at Night All Week: Lane Closures at Four Cross Streets Through Thursday, and Clarcona-Ocoee Work Through November 13

FDOT crews are installing traffic-monitoring equipment on U.S. 441 at Country Club Drive, West New Hampshire Street, Clarcona Ocoee Road and Beggs Road, 8 p.m. to 6 a.m. through Thursday — while a second project ties up the Clarcona-Ocoee junction for nearly two weeks.

Orlando Watch News Orlando • Just now • TRAFFIC
Orange Blossom Trail Narrows at Night All Week: Lane Closures at Four Cross Streets Through Thursday, and Clarcona-Ocoee Work Through November 13 (Orlando Watch News)

Orange Blossom Trail's night drivers get a slower week starting tonight. The Florida Department of Transportation's District 5 listings carry intermittent single-lane closures on U.S. 441 — the Trail — from Sunday, November 1 through Thursday, November 5, from 8 p.m. to 6 a.m. each night, at four separate cross streets: near Country Club Drive, near West New Hampshire Street, near Clarcona Ocoee Road and near Beggs Road. All four are for the same job, installing a Traffic Monitoring System along the corridor, and all four are listed as intermittent — a lane closes where the crew is working, not necessarily at every site every night.

The longer job sits at the north end of that list. A second FDOT project at U.S. 441 and Clarcona-Ocoee Road runs from Sunday, November 1 through Friday, November 13, also 8 p.m. to 6 a.m.: westbound single-lane closures on Clarcona Ocoee Road from Edgewater Drive to Long Road and on toward the Trail, and northbound single-lane closures on Orange Blossom Trail itself from Cinderlane Parkway to Clarcona-Ocoee Road, for concrete work and signalization. Drivers who use the Trail to reach Clarcona-Ocoee — or Clarcona-Ocoee to reach the Trail — should expect the junction to be a one-lane negotiation for the next two weeks of nights.

The practical frame is the usual FDOT one, and it matters on this corridor: the closures are overnight only, the schedules can shift with weather — and this week's forecast carries rain chances above 40% on four straight days — and the department asks drivers to slow down and use caution through the work zones. This is surface-street work on the Trail itself; the separate SR 408 expressway closures at the Trail, already in the station's traffic file, are the expressway's own project and run on their own schedule.

See an error in this story? Read our Corrections Policy or contact the newsroom.
MORE TRAFFIC →

More in Traffic